21.9 C
Ekiti State
Wednesday, November 11, 2026
More

    Latest Posts

    FUOYE Unveils Plans for New Professorial Building, Four Lecture Halls to Boost Academic Infrastructure

    Bunmi Olarewaju

    The Federal University Oye-Ekiti (FUOYE) has unveiled plans for the construction of a new Professorial Building comprising four lecture halls and office facilities as part of its efforts to strengthen teaching and learning infrastructure across the University.

    Speaking during the foundation laying ceremony, the Vice-Chancellor, Professor Joshua Olalekan Ogunwole, charged the contractor to ensure strict adherence to the approved architectural and structural specifications, warning against any form of compromise capable of undermining the quality, safety and durability of the building.
    He particularly cautioned against poor construction practices, including structural cracks and defective plumbing installations, stressing that the University expected a facility that would stand the test of time. this was disclosed at the foundation laying ceremony held at Ikole campus on Tuesday 3rd November, 2026.

    He described the project as a symbol of hope and a significant beginning of the University’s infrastructural intervention on our campuses, noting that the project would demonstrate the University’s commitment to modern infrastructure development and serve as a benchmark for subsequent construction projects.

    On the proposed lecture halls, the Vice-Chancellor emphasised the importance of creating a conducive academic environment that promotes student participation, interactive learning and effective knowledge transfer. He observed that contemporary teaching and learning approaches increasingly positioned lecturers as facilitators of knowledge rather than merely conventional transmitters of information.

    He expressed optimism that the proposed facility would reflect this modern philosophy of teaching and learning while providing students and staff with a more comfortable, functional and stimulating academic environment.

    He reiterated the University’s commitment to ensuring that the project was executed in strict compliance with the approved specifications, expressing confidence that its successful completion would pave the way for further infrastructural interventions across the campuses. According to him, the project, which will be executed by Essence Construction Limited is the first of the Tetfund intervention project under his watch that would be so approved; and it is expected to significantly address the growing demand for adequate lecture spaces and modern academic facilities.

    He warned that the project must be aligned to Tetfund specifications.
    With this innovation, the Vice Chancellor stressed that the institution is gradually moving away from conventional bungalow-style structures towards vertical building designs to maximise available land and provide more functional facilities for students and staff. The building must therefore be artistically designed to showcase modern architecture.

    The Acting Director of the Physical Planning Unit, Quantity Surveyor. Ojo Ademola, during the presentation of the architectural designs and project plans to the University Management described the proposed facility as a significant infrastructural intervention aimed at improving the University’s academic environment.

    Reiterating that the building will feature four spacious lecture halls, offices for professors and lecturers, classrooms with a seating capacity of approximately 200 students, and other essential facilities. The architectural design will also incorporates a courtyard to promote natural ventilation and enhance air circulation within the building.

    According to him the drawings further showcased the building’s front elevation, main entrance, parking arrangement, floor plans and other structural details designed to ensure efficient movement, functionality and optimal utilisation of available space.

    In his remarks, the General Manager of Essence Construction Limited, Engineer Bisi Wahab, expressed appreciation to the Vice-Chancellor and the University Management for the confidence reposed in the company.

    He assured the University that the company would deploy its professional expertise and resources to deliver the project within the stipulated eight-month period in accordance with approved specifications and required standards.

    Photo credit: Nifesimi Ogungbe

    Latest Posts

    spot_img

    Don't Miss

    Stay in touch

    To be updated with all the latest news, offers and special announcements.